Synopsis
The objective of this project is to add PIT Tag detection to the left fish ladder at the Chandler diversion dam, Prosser Wa.
Pictures
Journal
Radio Test
Darren Chase Posted on 11/24/04 09:27 AM
PSMFC was on site yesterday to adjust the test that is being performed on the radio gear currently in use for the communications to the ladder transceivers. The transmit side of the fiber communications to the Juvenile transceivers was removed to ensure that file sizes between the Platform and the test laptop are equal. The buffers were cleared on the Juvenile transceivers so that if the Juvenile facility is placed into collection prior to the completion of the radio test we will have buffered data to submit. This radio test is scheduled to last for one (1) month and started at 14:00 hrs.
Site Configuration for PRO
Don Warf Posted on 10/25/04 03:36 PM Modified by Don Warf on 10/25/04 03:43 PM
Documentation
Items in this folder were originally placed in the "Documentation" folder of the Prosser Dam Adult Antenna Construction Forum
Antenna 01 LCR Sweep Files
Scott Livingston Posted on 11/30/04 11:25 AM
These sweeps of the antenna were taken while the antenna was positioned in the guides with the shield ground attached prior to water up of the ladder
Antenna 02 LCR Sweep Files
Scott Livingston Posted on 11/30/04 11:24 AM
These sweeps of the antenna were taken while the antenna was positioned in the guides with the shield ground attached prior to water up of the ladder
Antenna 01 Traveler
Scott Livingston Posted on 11/30/04 11:20 AM
This antenna is installed on the Left Bank ladder upstream from the viewing window.
ProsserAntennaTraveler SN-01_Final.pdf
Antenna 02 Traveler
Scott Livingston Posted on 11/30/04 11:21 AM
This antenna is installed on the Left Bank ladder Down Stream from the viewing window.