Site Page PRO - Prosser Juvenile Fish Facility and Dam Passage
From PTAGISWiki
PRO
| Prosser Juvenile Fish Facility and Dam Passage, Yakama Nation Fisheries/USBR, located on the Yakima river at Prosser, WA.
|
Googlemap: Click and drag the map to pan around. Double click to zoom and center on the cursor. More zoom controls are in the upper left corner. Zoom out to see other sites, then click on the site code for more information.
| |
Contents |
Driving Directions
- From Tri-Cities to the Juvenile Facility
- Head west from W Clearwater Ave
- Turn left into the I-82 W entry ramp to Yakima - go 26 miles
- Take the WA-22 exit 82 to Mabton/Paterson (WA-221)
- Turn left onto Wine Country Rd - go 1.5 miles
- Turn right onto 10th St - go 0.1 miles
- Turn right onto Grant Ave - go 0.2 miles
- Turn right onto Grande Rd (just across the bridge)
- Turn left onto canal access dirt road - go 0.5 miles
- Turn right (at canal screens) into Juvenile Fish Facility access road
- Arrive at Prosser Juvenile Fish Facility
- From Tri-Cities to the south side of Chandler Dam (access to the right and center ladders)
- Head west from W Clearwater Ave
- Turn left into the I-82 W entry ramp to Yakima - go 26 miles
- Take the WA-22 exit 82 to Mabton/Paterson (WA-221)
- Turn left onto Wine Country Rd - go 1.5 miles
- Turn right onto 10th St - go 0.1 miles
- Continue accross Grant Ave
- Follow dirt road to the left
- Arrive at Chandler Diversion Dam
- From Tri-Cities to the north side of Chandler Dam (access to the left ladder)
- Head west from W Clearwater Ave
- Turn left into the I-82 W entry ramp to Yakima - go 26 miles
- Take the WA-22 exit 82 to Mabton/Paterson (WA-221)
- Turn left onto Wine Country Rd - go 1.5 miles
- Turn right onto 10th St - go 0.1 miles
- Turn right onto Grant Ave - go 0.2 miles
- Turn left onto Old Inland Empire Highway (just across the bridge) - go 0.25 miles
- Turn left onto dam access road
- Arrive at Chandler Diversion Dam
Site Configuration
Historical Site Configurations
PRO: Prosser Diversion Dam Combined
This configuration adds counting window detectors from the
middle and right ladders to previous.
Seq. #110: From 30-Aug-05 To Present
Smolt Bypass Separat A1 A2 A3
Smolt Bypass Sample 51 52
Left Bank LDR Counti 01 02
Middle LDR Counting 03 04
Right Bank LDR Count 05 06
Seq. #100: From 19-Oct-04 To 30-Aug-05
Separator / Sample A1 A2 A3
Sample Room Exit 51 52
Left Bank LDR Counti 01 02
PRJ: Prosser Dam (Chandler Dvrsn.)
Initial ISO Configuration. Superceded by PRO Oct. 19, 2004.
Seq. #120: From 10-Nov-99 To 3-Jul-04
SEPARATOR / SAMPLE A1 A2 A3
SAMPLE ROOM EXIT 51 52
Seq. #110: From 1-Jan-94 To 10-Nov-99
SEPARATOR C8 CA CC CE
SAMPLE ROOM C4 C6
Seq. #100: From 25-Apr-89 To 1-Jan-94
SEPARATOR C8 CA CC CE
SAMPLE ROOM C4 C6
Event Log
ftp://ftp.ptagis.org/Reports/event_log/PRO
Pictures
PIT Tag Room
Separator Antenna Group
Transceiver IDs A1, A2, A3
Sample Antenna Group
Transceiver IDs 51, 52
The facility is currently being remodeled, these pictures show work in progress.
Left Ladder
Transceiver IDs 01, 02
Center Ladder
Transceiver IDs 03, 04
Right Ladder
Transceiver IDs 05, 06