UPS Installation Site Status and Backup Configuration.
Granite Adult:
PARTIALY COMPLETE
Completed
Data Collection Platform, Not sure about other peripheral devices.
Systems scheduled for UPS installation:
- Ladder Antennas.
- 2-orifice and 2-Slot antennas located near the exit weirs.
- 2-orifice and 2-Slot antennas located near the exit weirs.
Granite Juvenile:
PARTIALY COMPLETE
- Completed.
- Data Collection Platform, Not sure about other peripheral devices.
- Data Collection Platform, Not sure about other peripheral devices.
Little Goose.
COMPLETED
Full Flow Transceivers:
Completed at the time of the FF installation.
Data Collection Platform, HSIP and associated peripherals:
Wiring fault in panel has been corrected. UPS installation as per the UPS wiring schema TBD
The UPS installation was completed on 12/1/09
Lower Monumental.
COMPLETED
Full Flow Transceivers UPS Installation:
Completed on 11/09/09.
Data Collection Platform, HSIP and associated peripherals:
Installation was completed 11//10/09 as per the standard UPS schema.
Ice Harbor.
Installation Pending.
- Systems scheduled for UPS installation:
- All 4 Full Flow Antennas.
- Ladder Antennas. 2-orifice and 2-Slot antennas on the North and South ladder exit wiers.
- Data Collection Platform,HSIP and associated peripherals.
- All 4 Full Flow Antennas.
McNary Juvenile.
UPS Installation Partially Complete
Completed:
UPS's are installed on the DCP, need to incorporate the standard power schema.
- Systems scheduled for UPS installation:
- All 4 Full Flow Antennas. Transcievers 01 and 04 were completed on 12/1/09. Other two to follow after the first of the year.
- HSIP and associated peripherals.
MC1.
UPS Installation Partially Complete.
Completed. Data Collection Platform
- Systems scheduled for UPS installation:
- 2-Counting Window Antennas
- HSIP and associated peripherals.
MC2.
UPS Installation Partially Completed.
Completed. Data Collection Platform
- Systems scheduled for UPS installation:
- 3-Counting Window Antennas
- HSIP and associated peripherals.
John Day.
COMPLETE
Full Flow Transceivers: UPS installation completed on 6/10/09
Data Collection Platform:
Installation was completed 11//10/09 as per the standard UPS schema.
Bonneville
BO1:
UPS Installation Partially Complete
Completed
- 4-Slot Antennas.
- Data Collection Platform,
- Systems scheduled for UPS installation:
- HSIP and associated peripherals.
- HSIP and associated peripherals.
BO2:
COMPLETED
- Data Collection Platform.
BO3:
COMPLETED
- Data Collection Platform.
BO4:
COMPLETE
- 4-Slot Antennas.
- Data Collection Platform and HSIP.
B2J:
UPS Installation Partially Complete
Completed
- 4-Full Flow Antennas.
- Data Collection Platform, HSIP and associated peripherals.
Note: Need to configure back-up power schema as per convention.