Site UPS Installs

From PTAGISWiki

Jump to: navigation, search

Contents

UPS Installation Site Status and Backup Configuration.

Granite Adult:

PARTIALY COMPLETE

Completed Data Collection Platform, Not sure about other peripheral devices.

Systems scheduled for UPS installation:

  • Ladder Antennas.
    • 2-orifice and 2-Slot antennas located near the exit weirs.



Granite Juvenile:

PARTIALY COMPLETE
  • Completed.
    • Data Collection Platform, Not sure about other peripheral devices.


Little Goose.

COMPLETED

Full Flow Transceivers: Completed at the time of the FF installation.

Data Collection Platform, HSIP and associated peripherals: Wiring fault in panel has been corrected. UPS installation as per the UPS wiring schema TBD

The UPS installation was completed on 12/1/09

Lower Monumental.

COMPLETED

Full Flow Transceivers UPS Installation: Completed on 11/09/09.

Data Collection Platform, HSIP and associated peripherals: Installation was completed 11//10/09 as per the standard UPS schema.

Ice Harbor.

Installation Pending.
  • Systems scheduled for UPS installation:
    • All 4 Full Flow Antennas.
    • Ladder Antennas. 2-orifice and 2-Slot antennas on the North and South ladder exit wiers.
    • Data Collection Platform,HSIP and associated peripherals.


McNary Juvenile.

UPS Installation Partially Complete

Completed: UPS's are installed on the DCP, need to incorporate the standard power schema.

  • Systems scheduled for UPS installation:
    • All 4 Full Flow Antennas. Transcievers 01 and 04 were completed on 12/1/09. Other two to follow after the first of the year.
    • HSIP and associated peripherals.


MC1.

UPS Installation Partially Complete.

Completed. Data Collection Platform

  • Systems scheduled for UPS installation:
    • 2-Counting Window Antennas
    • HSIP and associated peripherals.



MC2.

UPS Installation Partially Completed.

Completed. Data Collection Platform

  • Systems scheduled for UPS installation:
    • 3-Counting Window Antennas
    • HSIP and associated peripherals.



John Day.

COMPLETE

Full Flow Transceivers: UPS installation completed on 6/10/09

Data Collection Platform: Installation was completed 11//10/09 as per the standard UPS schema.

Bonneville

BO1:

UPS Installation Partially Complete

Completed

  • 4-Slot Antennas.
  • Data Collection Platform,
  • Systems scheduled for UPS installation:
    • HSIP and associated peripherals.



BO2:

COMPLETED
  • Data Collection Platform.


BO3:

COMPLETED
  • Data Collection Platform.


BO4:

COMPLETE
  • 4-Slot Antennas.
  • Data Collection Platform and HSIP.



B2J:

UPS Installation Partially Complete

Completed

  • 4-Full Flow Antennas.
  • Data Collection Platform, HSIP and associated peripherals.

Note: Need to configure back-up power schema as per convention.