Sree upgrade
From PTAGISWiki
Trying to upgrade pitblade from SREE 7.0 to SREE 9.1 ran into problems with the new authentication scheme for the admin account. It now requires an LDAP account. Our attempts also exposed a bug in the product that was fixed in a daily build. Now we can log into the SREE 9.1 Enterprise Manager, but attempts to run a report template that was created under SREE 7.0 fail. The report seems to take an appropriate amount of time, based on the complexity of the SQL, but the results that are returned are always empty. No interesting errors are present in the logs when this occurs.
Is there an upgrade process for 7.0 templates to 9.1?
web meeting with inetsoft tech support
Rday 12:45, 15 April 2008 (PDT)
The reports are being registered correctly but do not run correctly. Used SREE Enterprise Manager to verify that the reports are correctly registered.
I sent him a copy of rday_mc1_in_april.srt and he opened it in designer to try to troubleshoot it. He couldn't find anything wrong with the format of the report, but had to replace the data binding for his testing.
He was able to reproduce the problem. It appears to be a bug in the way that reports without any defined columns work. The report is dynamic and so we don't want any columns defined. If he can prove that it is really a regression from the behavior of 7.0 to 9.1, then he can submit it as a bug and we can test the next daily build.
