Troy is working on:

Contents

2010

  1. PLC Project- Complete all priority 1 PLC tasks in the PLC work list.
    1. ARRT design and Programming
    2. Technical Lead for Ethernet Comms at All Sites
    3. Test M4.
    4. ON/OFF switches for Slide Gates.
  2. Design,Program and Install the APTTS Sorter Controls
  3. Write SOPs

2009

  1. Technical Lead for Ethernet Comms at All Sites
  2. Design,Program and Install the APTTS Sorter Controls
  3. Write SOPs

2008

  1. Lab Move and Reconstruction
  2. Continue All Items on the PLC task List
  3. Design, Program and Install the BCC Read Range Tester
  4. Write SOPs

2007

  1. Continue the R&D of Anti-Slam Controls for Slide Gates
  2. Develop Water Level Sensing System for Adult Ladders
  3. Write SOPs
  4. Perform_M4_Lab_and_Field_Tests_(Troy)

2006

  1. Publish three primary SOPs (Troy)
  2. Complete new anti-slam controls for slide gates
  3. Perform M4 Lab and Field Tests (Troy)
  4. Complete Winter Mode controls for BCC